Resultant-er location load distribution-er first moment theke pawa jay. Numerator holo reference point-er respect-e distributed load-er moment, ar denominator holo total resultant force. Constant UDL-er khetre resultant loaded span-er midpoint-e act kore. Triangular load-er khetre resultant triangle-er centroid diye act kore, ja maximum-intensity side theke base-er ek-tritiyangsho dure.
Location of the Resultant Force
Distributed load-er resultant kothay act kore ta original load-er moment ebong resultant force-er moment equivalent kore determine kora hoy.
x̄ = (∫ₐᵇ x w(x) dx) / (∫ₐᵇ w(x) dx)
Explanation
Variables
| Symbol | Meaning | Unit |
|---|---|---|
x̄ | Reference origin theke resultant-er location | m |
x | Load-er position coordinate | m |
w(x) | Distributed load intensity | N/m |
F_R | Total resultant load | N |
Example or application
4 m span-er UDL-er resultant span-er midpoint-e, orthat ek pranto theke 2 m dure act kore.
Sources and verification
Sources are shown as provided in the project data. Not every source has yet been independently verified. Please report errors or missing citations.