Trapezoidal load-ke ekta rectangular load ebong ekta triangular load-er jogfol hisebe bhanga jay. Total resultant holo trapezoid-er area. Resultant-er location determine korte total load-er first moment use kora hoy, ba rectangle ebong triangle-er individual resultants combine kora jay. Load-er direction eki hole individual resultant-gulor magnitude add kora jay.
Trapezoidal Load Distributions
Trapezoidal distributed load-e intensity loaded span-er dui prante alada nonzero value hote pare ebong majhe linear bhabe change kore.
F_R = ((w₁ + w₂) / 2)L
Explanation
Variables
| Symbol | Meaning | Unit |
|---|---|---|
F_R | Equivalent resultant force | N |
w₁ | Loaded span-er prothom prante load intensity | N/m |
w₂ | Loaded span-er shesh prante load intensity | N/m |
L | Loaded length | m |
Example or application
4 m span-e load intensity 2 kN/m theke 6 kN/m hole resultant F_R = ((2 + 6)/2) × 4 = 16 kN.
Sources and verification
Sources are shown as provided in the project data. Not every source has yet been independently verified. Please report errors or missing citations.